Epping Road TIF Project Construction

Project Type:
Water/Sewer/Drains
Project Status: 
Underway
Location: 
Exeter, NH

The project includes drainage improvements, water sewer utility extensions, roadway widening, and the addition of nearly continuous curbed sidewalks along both sides of Epping Road. The project is divided into phases to be complete in the summer of 2025. Traffic delays, though unavoidable, will be managed to the extent practicable.